HEAVY ENGINEERING PROJECTS
 

A02 Südautobahn - Bridge constr. A6 to A10 and G22

2014  
Client: ASFINAG Service GmbH
Performance: Reconditioning concept and structural reanalysis
 
L704 Gatschberggraben-Bridge, reconditioning
2013 - 2014 approx. € 1 mio excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performance: Reconditioning concept, structural reanalysis, tender and detailed design
 
L615 Saggau-Bridge, general overhaul and widening
2013 - 2014 approx. € 600.000 excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performance: general design, documents for the water legislation procedure, tender and detailed design
 
S35 and S06 - Bridge constr., bridge evaluation
2013  
Client: VA TECH WABAG GmbH
Performance: Bridge evaluation incl. structural reanalysis and reconditioning concept
 
General overhaul of the Waltenbach-bridge
pdf statik-pdf Mayi 12 - Juni 2013  approx. € 1,4 mio. excl. VAT
Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design
 
S36 Murtal-motorway - Main check of the bridge constr.
2011 - Oct. 2013  
Client: ASFINAG Service GmbH Abteilung
Performance: Report and appraisal of the condition of the
construction
Feldaisttal-bridge in Freistadt Nord pdf statik-pdf 2012 - 2013 approx. € 15 mio excl. VAT
Client: ARGE Ingenieurbau S10 BL 4.2
Peformance: general design and detailed design
 
2 railway bridges across the river Drava in Villach
pdf statik-pdf 2010 - 2012 € 5,6 mio excl. VAT
Client: ÖBB Infrastruktur AG
Performance: general design and detailed design
 
Bridge overhaul - Kainach-bridge G63C
March 12 - Sept. 12  
Client: Land Steiermark
Peformance: general design and detailed design
 
Forecourt of the former police station in Bad Radkersburg
pdf statik-pdf Aug. 11 - Aug. 12  
Client: Stadtgemeinde Bad Radkersburg
Performance: structural analysis, execution design
 
AST Salzburg Süd - overcrossing A10, triple-webbed T-beam pdf statik-pdf 2008 - 2011  
Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design
 
L40 general refurbishment, A10 Tauernautobahn
pdf statik-pdf March 2007 - June 2011  
Client: ASFINAG Autobahn Service GmbH Süd
Performance: check-up of the statical design of the bracing
construction
Digestion tank Shiraz, new construction of 3 cylindrical tanks
since 2010 not known
Client: VA TECH WABAG GmbH
Performance: construction design, structural analysis and
execution design
Wildbrücke, new construction of a road bridge
Febr. 2007 - 2010  
Client: Stadtgemeinde Völkermarkt
Performance: general design and detailed design in cooperation with the office Zimmermann
 
Bikeway - bridge Bregenz - Hard 2010 approx.€ 1,45 mio excl. VAT
Client: Gemeinde Hard - Stadt Bregenz
Performance: complete design project
First prize - competition for the realisation
 
Power plant Almbach, new constr.of a hydroelectr. power plant pdf statik-pdf July 09 - April 10 € 3,45 mio excl. VAT
Client: Ingenieurbüro Eisner ZT GmbH
Performance: structural preliminary design, detailed structural analysis, formwork and reinforcement design
 
Temporary pedestrian bridge in Leibnitz across a railway track
March 2009 - April 2010  
Client: ÖBB - Infrastruktur Bau AG
Performance: general project
 
A02 Süd Autobahn, main bridge-evaluation
2009  
Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction
 
A09 Pyhrn Autobahn, main bridge-evaluation
2009  
Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction
 
Frontier-bridge in Bad Radkersburg, bridge refurbishment
2004 - Nov. 2009 approx.€ 1,4 mio
Client: Amt der Steiermärkischen Landesregierung
Performance: general project and detailed design
 
LSW Unterwald TA D Ratsch, noise barrier June 2007 - Sept. 2008  
Client: ASFINAG Autobahn Service GmbH Süd
Performance: general design and detailed design
 
G21 – Talübergang, general bridge refurbishment pdf statik-pdf Oct. 04 - July 08 approx.€ 3,0 mio excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performance: general project and detailed project
 
Tehran Sewarage, 6 digestion tanks pdf statik-pdf Sept. 2005 - June 2007  
Client: VA Tech WABAG GmbH
Performance: structural analysis and constuctive design
 
P06V Zirknitzgrabenbrücke, Autobahn-arch-bridge
pdf statik-pdf Aug. 2002 - Jan. 2006   € 5,10 mio excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performanse: Revision of the general project and detailed design
 
Cable bridge in Halbenrain, Pedestrian and bikeway bridge
pdf statik-pdf Sept. 2004 - Dec. 005  € 0,60 mio excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design
 
P40V Packabschnitt  Niessenbachbrücke, new constr.archbridge
pdf statik-pdf Jan. 2001 - Febr. 2003 € 5,85 mio excl. VAT
Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design
 
Ski-road-bridge Katschberg, timber bridge construction
1998  
Client: Dipl. Ing. Fritz Kermer
Performance: structural analysis and execution design
 
Wastewater treatment plant Graz-Gössendorf, digestion tank
1996 € 1,00 mio excl. VAT
Client: Bauunternehmung Granit
Performance: structural analysis and execution design