Alteration of the train station in Frohnleiten |
||
|
||
| Client: | ÖBB Infrastruktur AG |
|
| Reference person: | Engelbert Kahr |
|
| Specifications of the building : | Alteration of the train station in Frohnleiten consisting of a new electronic interlocking system, an underground walkway with a 7m cantilever roof construction, roofed train platforms and the widening of the existing underpass. The supporting structure of the existing underpass is to be structurally re-analysed and there is to be made an investigation of variants of a possible bridge refurbishment and a new construction. |
|
| Services rendered by S+W: | structural preliminary analysis |
|
| back | ||