Projects

Silo Hunhary

New construction silo facility Hungary – cement silo

Client: Gleitbau Salzburg GmbH

Period of performance: 2021-2022

Dimensions: 22m x 22m x 32m (L/W/H)

Service: Structural planning of steel construction, concrete construction, execution planning

 

Leistungszeitraum: (Deutsch) 2021-2022

Postquadrat – Housing construction Alte Poststraße

New construction of two wooden residential buildings with partial basements with underground parking for PREMIUM Immobilien GmbH
Client: Praschl-Goodarzi Architects ZT-GmbH
Dimensions: 60m x 40m x 13m (L / W / H)
Service: Structural planning, concrete construction, timber construction, implementation planning, fire protection

Leistungszeitraum: 2019-2021

SeneCura Dobl

Construction of a new care home for the SeneCura Kliniken und Heimebetriebsgesellschaft mbH
Client: M&R GU GmbH
Dimensions: 100m x 75m x 11m (L / W / H)
Service: Structural planning, concrete construction, implementation planning

Leistungszeitraum: 2020

Student residence Innsbruck

Reconstruction, extension and extension of a 17.5m high existing building in Maximilianstrasse in Innsbruck

Client: Wallner & Schemitsch civil engineers

Dimensions: 30m x 36m x 17m (L/W/H)

Services: structural engineering steel construction, concrete construction, timber construction, implementation planning, fire protection

Leistungszeitraum: 2019-2021

Historic glass house Graz

Refurbishment of the historic steel and glass construction of the palm house in the Graz Botanical Garden
Client: BIG – Bundesimmobiliengesellschaft
Period of performance: 2018-2021
Dimensions: 56m x 8.5m x 11m (L / W / H)
Services: structural engineering steel construction, concrete construction, timber construction, implementation planning, fire protection

Leistungszeitraum: 2018-2021

New building Silicon Austria Labs (SAL) & DH (DataHouse) TU Graz

Client: Zinterl Architekten ZT GmbH

Constructor: BIG Bundesimmobiliengesellschaft m.b.H.

Overall dimensions: approx. 180m x 35m
Max. Height: about 20m

Performance: Static constructive preliminary design, structural design
Calculation of quantities, tendering (LVs building master work)
Detailed static calculation of concrete construction
Execution planning concrete construction (formwork and reinforcement)
Reinforcement acceptance

Leistungszeitraum: 2018-2021

SMART CITY MITTE (SCM) parking garage AVL

Client: AVL List GmbH

Overall dimensions: approx. 80m x 30m
Max. Height: about 20m

Performance: Detailed static calculation of concrete construction
Execution planning concrete construction (formwork and reinforcement)
Reinforcement acceptance

Leistungszeitraum: 2018-2021

Farina Mill

Demolition and rebuilding of the semolina loading facility
Client: GoodMills Austria GmbH Loading
capacity: 936 t
Dimensions: 19.40mx 9.80mx 32.30m (L/ W/H)
Services: general planning, structural planning, fire protection planning, implementation planning, site supervision, BauKG

Leistungszeitraum: 2017-2018

Flour silo Kyjov (Tschechien)

Client: GoodMills Cesko
Storage capacity: approx. 1350 t
Dimensions of the silo building: 19.30mx 13.25mx 26.95m (L / W / H)
Service: Concept planning, costing, structural planning, static-constructive processing

Leistungszeitraum: 2019-2020

General refurbishment Johann Puch Museum Graz

Client: Holding Graz / Municipal Services GmbH
Usable area: 3,570.00m²
Dimensions: 91.00mx 30.00mx 7.50m (L / W / H)
Information: holdings from 1912
Services: Inventory, general static calculation (steel and timber construction), elaboration of the renovation concept in coordination with the BDA, fire protection planning, rough cost estimate,
Period of performance: 2019

Leistungszeitraum: 2019

New construction of bio silo plant

Client: Gsellmann Immo GmbH
Performance: general design, structural analysis, fire prevention desgin, execution planning, building supervision, construction coordination for health and safety issues

Leistungszeitraum: 2017 - 2018

FBZ Traunkirchen

Client: Graf-Holztechnik GmbH
Performance: detailed structural analysis of the timber construction

Leistungszeitraum: 2015 - 2017

Argos Graz

Client: Kulmer Holz-Leimbau GesmbH
Performance: structural analysis facade

Leistungszeitraum: 2017

Flood Protection Measure Kainach – Civil Engineering Structures

Client: urban municipality of Voitsberg
Performance: general design, tender design, detailed design

Leistungszeitraum: 2016-2017

Quartier 7 Reinighaus Graz

Client: ENW Gemeinnützige Wohnungsgesellschaft m.b.H.
Performance: structural analysis, fire prevention design

Leistungszeitraum: 2016 - dato

Kammerlokal Carinthia, Klagenfurt

Client: Edgar Hammerl Architektur ZT GmbH
Performance: structural analysis (general plannung competition 1st prize)

Leistungszeitraum: 2017

Conversion – Andritz AG paper factory Graz

Client: Kamper ZT KG
Performance: fire prevention design, accompanying fire protection, fire protection certificate

Leistungszeitraum: 2016 - 2017

General renovation school center Deutschfeistritz

Competition

Leistungszeitraum: 2016/04

Favoritenstraße 183-185, Extension and rebuilding

Client: Fa. ATLAS IMPORT EXPORT Ges. m.b.H.
Performance: engineering assessment, structural analysis

Leistungszeitraum: 2015/10 - 2016/03

Cardiac Rehab Bad Ischl

Client: Sozialversicherungsanstalt der gewerblichen Wirtschaft
Performance: accompanying fire protection, fire protection certificate

Leistungszeitraum: 2015 - 2016

ARA Gössendorf Capacity expansion of the post-thickener

Client:Stadt Graz vertreten durch die Holding Graz Services Wasserwirtschaft
Performance: preliminary structural analysis, statically constructive treatment, etc.

Leistungszeitraum: 2015 - 2017

SKA RZ Bad Schallerbach, annex and alteration

Client: BMASK Sektion II – Sozialversicherung
Performance: survey report of the price acceptability

Leistungszeitraum: 2014/05 - 2014/09

Extension of the silo constr. Gsellmann

Client: Gsellmann Mischfuttererzeugung GmbH
Performance: feasibility study, structural and constructive preliminary design, structural analysis

Leistungszeitraum: 2015/03 - 2015/07

New constr. of an apartment building, Graz

Client: Ing. Michelatsch GmbH
Performance: structural analysis, execution design

Leistungszeitraum: 2015 - 2016

S37 Klagenfurter highway – Design of the engineering construction

Client: Asfinag Baumanagement GmbH
Performance: preliminary design, general design, tendering, detailed design

Leistungszeitraum: 2015 - 2017

Check of the structural analysis of the annex of the state hospital in Feldbach

Client: KIG Steiermärkische Krankenanstaltengesellschaft mbH
Performance: check of the structural analysis

Leistungszeitraum: 2014/07 - 2017/07

Pedestrian Bridge Wölzbach

Client: Rauter Fertigteilbau GmbH
Performance: preliminary design, detailed design

Leistungszeitraum: 2014

WIKI gym center Graz

Client: Österreichisches Kinderrettungswerk Landesverband Steiermark
Performance: fire control planning, planning coordination, etc.

Leistungszeitraum: 2014/06 - 2015/06

New construction of a complex of buildings with basement car park, Graz

Client: Millöckergasse 27 – Wohnbau GmbH
Performance: structural analysis, execution design

Leistungszeitraum: 2014/05 - 2015/02

Seniorenzentrum Lassing, new construction

Client: Gem. Wohn- u. Siedlungsgenossenschaft ennstal
Performance: controlling of the execution of the fire prevention measures, fire prevention survey

Leistungszeitraum: 2014 - 2015

Medcampus Graz, new construction

Client: BIG
Performance: controlling of the execution of the fire prevention measures, fire prevention survey

Leistungszeitraum: 2014 - 2017

WIKI gym center Graz, new construction

Client: Österreichisches Kinderrettungswerk
Performance: supporting structure design (concrete constr.)

Leistungszeitraum: 2014 - 2015

Thermal bath Bad Elster, new construction

Client: Graf Holztechnik GmbH
Performance: detailed structural analysis of the timber constr.

Leistungszeitraum: 2014

LISI house on Paolo pontoons, new construction

Client: Hasslacher Holztechnik GmbH
Performance: structural analysis (incl. floating stability analysis)

Leistungszeitraum: 2014/06 - 2014/10

Wheelset axle test bench-Institute of Lightweight design (TU Graz)

Client: Zengerer Planung GmbH
Performance: structural analysis and execution design of the test benches

Leistungszeitraum: 2014/05 - 2014/10

Observation platform Krkonose, new construction

Client: Graf Holztechnik GmbH
Performance: structural preliminary design

Leistungszeitraum: 2014/04

A02 Südautobahn – Bridge constr. A6 to A10 and G22

Client: ASFINAG Service GmbH
Performance: Reconditioning concept and structural reanalysis

Leistungszeitraum: 2014

Bypass-bridges across the Danube

Competition

Leistungszeitraum: 2014/04

Alteration of the train station in Frohnleiten

Client: ÖBB-Infrastruktur Bau AG
Performance: general design, structural check of the existing construction

Leistungszeitraum: 2014

Housing estate Theodor-Körner-Straße 145 u. 145A, Graz

Client: Ing. Michelatsch GmbH
Performance: structural analysis, execution design

Leistungszeitraum: 2014 - 2015

Refurbishment design of the LKH West

Client: Krankenanstalten Immobilienges. mbH
Performance: structural analysis, detailed design

Leistungszeitraum: 2013 - 2014

L704 Gatschberggraben-Bridge, reconditioning

Client: Amt der Steiermärkischen Landesregierung
Performance: Reconditioning concept, structural reanalysis, tender and detailed design

Leistungszeitraum: 2013 - 2014

L615 Saggau-Bridge, general overhaul and widening

Client: Amt der Steiermärkischen Landesregierung
Performance: general design, documents for the water legislation procedure, tender and detailed design

Leistungszeitraum: 2013 - 2014

S35 and S06 – Bridge constr., bridge evaluation

Client: VA TECH WABAG GmbH
Performance: Bridge evaluation incl. structural reanalysis and reconditioning concept

Leistungszeitraum: 2013

Housing estate Eggenberger Allee 33, new construction

Client: Eggenberger Allee 33 – Wohnbau GmbH
Performance: complete supporting structure design

Leistungszeitraum: 2013 - 2014

Housing estate Körösistraße (Graz), new construction

Client: Körösistraße 138 – Wohnbau GmbH & Co KG
Performance: complete supporting structure design

Leistungszeitraum: 2013 - 2014

Tunnel-objects A07, A08 and A09, evaluation of the constructional fire protection and the structural components

Client: ASFINAG Baumanagement GmbH
Performance: incl. package of measures and rough cost estimate

Leistungszeitraum: 2013

Tunnel-objects S01, evaluation of the constructional fire protection and the structural components

Client: ASFINAG
Performance: incl. package of measures and rough cost estimate

Leistungszeitraum: 2013

Grandi Molini, storage building annex

Client: Grandi Molini Handel GmbH
Performance: general design

Leistungszeitraum: 2013 - 2014

thermal bath Kärnten Therme Warmbad-Villach

Client: Kärnten Therme GmbH
Performance: check of the structural analysis

Leistungszeitraum: 2013/03 - 2014/05

City hotel Margaretengürtel

Client: Michaeler & Partner
Performance: structural analyses, formwork and reinforcement design

Leistungszeitraum: 2012/07 - 2012/11

Check static calculation tribune Stadium Klagenfurt

Client: Arbeitsgemeinschaft Euro 2008
Performance: check of the structural analyses, vibration analyses

Leistungszeitraum: 2012 - 2013

McDonalds house for children, new construction

Client: Viereck Architekten ZT – GmbH
Performance: controlling of the execution of the fire prevention measures, fire prevention survey

Leistungszeitraum: 2012 - 2014

General overhaul of the Waltenbach-bridge

Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design

Leistungszeitraum: (Deutsch) 2012/05 - 2013/06

Feldaisttal-bridge in Freistadt Nord

Client: ARGE Ingenieurbau S10 BL 4.2
Peformance: general design and detailed design

Leistungszeitraum: 2012 - 2013

Bridge overhaul – Kainach-bridge G63C

Client: Land Steiermark
Peformance: general design and detailed design

Leistungszeitraum: 2012/03 - 2012/09

Housing estate Rosenkranzgasse 7,9, 11 Graz, new costruction

Client: Ing. Michelatsch GmbH
Performance: complete supporting structure design

Leistungszeitraum: 2012 - 2013

Preservation of evidence “Südgürtel”

Client: Amt der Steiermärkischen Landesregierung
Performance: Preservation of evidence of adjacent constructions

Leistungszeitraum: 2012 - 2016

Grüngasse 25, New construction and refurbishment

Client: Synergie Grüngasse 25
Performance: structural analysis, formwork and reinforcement design

Leistungszeitraum: 2011/07 - 2013/01

Objekt Gaudeamus Velenje School Centre, Slovenia

Client: Oberressl & Kantz ZT-GmbH
Performance: statical calculation

Leistungszeitraum: 2011

Recalculation and strengthening Retirement home Seekirchen

Client: UNIQA Sachversicherung AG
Performance: check of the structural analysis

Leistungszeitraum: 2011 - 2012

S36 Murtal-motorway – Main check of the bridge constr.

Client: ASFINAG Service GmbH Abteilung
Performance: Report and appraisal of the condition of the
construction

Leistungszeitraum: 2011 - 2013/10

Forecourt of the former police station in Bad Radkersburg

Client: Stadtgemeinde Bad Radkersburg
Performance: structural analysis, execution design

Leistungszeitraum: 2011/08 - 2012/08

SKA RZ Bad Aussee, annex and alteration

Client: BMASK Sektion II und Abteilung II/A/3
Performance: survey report of the price acceptability

Leistungszeitraum: 2011

SKA RZ Bad Tatzmannsdorf, partial new construction and modification of a rehabilitation centre

Client: BMASK Sektion II und Abteilung II/A/3
Performance: survey report of the price acceptability

Leistungszeitraum: 2011

Silo-plant Pinczker Albener Hafen, annex of a silo plant

Client: Bioprodukte Pinczker GmbH
Performance: general design

Leistungszeitraum: 2011/04 - 2012/10

Hydroelectric power plant in Kammern

Client: 2G Wasserkraft GmbH
Performance: preliminary structural analysis, detailed structural analysis, etc.

Leistungszeitraum: 2011/03 - 2012/03

General refurbishment of the A02 object P44L „Haswendbrücke“

Client: ASFiNAG Baumanagement GmbH
Performance: general design, tender design, structural analysis

Leistungszeitraum: 2011 - 2013

Weinkellersiedlung Kleinoscheg, new construction of a housing estate

Client: KS – Kern & Sommersguter Bauoptimierung GmbH
Performance: design of a fire prevention concept

Leistungszeitraum: 2010 - 2011

BG/BRG St. Martin Villach, renovation and modification

Client: Bundesimmobiliengesellschaft m.b.H.
Performance: controlling of the execution of the fire prevention measures

Leistungszeitraum: 2010 - 2011/09

Pedagogic academy in Eggenberg, extension and modification

Client: Architekt Goltnik ZT GmbH
Performance: controlling of the execution of the fire prevention measures

Leistungszeitraum: 2010 - 2011

2 railway bridges across the river Drava in Villach

Client: ÖBB Infrastruktur AG
Performance: general design and detailed design

Leistungszeitraum: 2010 - 2012

Digestion tank Shiraz, new construction of 3 cylindrical tanks

Client: VA TECH WABAG GmbH
Performance: construction design, structural analysis and
execution design

Leistungszeitraum: 2010

Bikeway – bridge Bregenz – Hard

Client: Gemeinde Hard – Stadt Bregenz
Performance: complete design project
First prize – competition for the realisation

Leistungszeitraum: 2010

Supply centre LKH Graz, nine-storey building

Client: Krankenanstalten Immobilienges.mbH
Performance: check of the structural analysis

Leistungszeitraum: 2010 - 2014

Housing estate Petersgasse 87 u. Friedensgasse 3, 3a, 3b

Client: Ing. Michelatsch GmbH
Performance: complete supporting structure design

Leistungszeitraum: 2010 - 2011

SKA RZ St.Radegund, new construction of a rehabilitation centre

Client: BMASK Sektion II und Abteilung II/A/3
Performance: Gutachten der Preisangemessenheit

Leistungszeitraum: 2010

Silo-plant STAMAG in Vienna, annex of a barley silo plant

Client: STAMAG-Stadlauer Malzfabrik GesmbH
Performance: supporting structure design

Leistungszeitraum: 2010/07 - 2011/12

Silo construction -Kittel Mühle Plaika, new construction

Client: Anton Kittel Mühle Plaika GmbH
Performance: supporting structure design and design of explosion prevention

Leistungszeitraum: 2010/12 - 2011/06

Bikeway-bridge Bregenz – Hard

Client: Gemeinde Hard – Stadt Bregenz
Performance: complete design performance
First prize – competition for the realisation

Leistungszeitraum: 2010

Supply Centre LKH Graz

Client: Krankenanstalten Immobilienges. mbH
Performance: check of the structural analysis

Leistungszeitraum: 2010 - 2016

Digestion tank Shiraz

Client: VA TECH WABAG GmbH
Performance: construction design, structural analysis, execution design

Leistungszeitraum: 2010

Power plant Almbach, new constr.of a hydroelectr. power plant

Client: Ingenieurbüro Eisner ZT GmbH
Performance: structural preliminary design, detailed structural analysis, formwork and reinforcement design

Leistungszeitraum: 2009/07 - 2010/04

A02 Süd Autobahn, main bridge-evaluation

Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction

Leistungszeitraum: 2009

A09 Pyhrn Autobahn, main bridge-evaluation

Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction

Leistungszeitraum: 2009

Villa Hillinger, new construction

Client: Leo Hillinger Privatstiftung
Performance: supporting structure design

Leistungszeitraum: 2009

RCA – hall in Vienna, redevelopment of the roof construction

Client: ÖBB Immobilienmanagement GmbH
Performance: structural evaluation, redevelopment concept

Leistungszeitraum: 2009 - 2010

AST Salzburg Süd – overcrossing A10, triple-webbed T-beam

Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design

Leistungszeitraum: 2008 - 2011

Residential establishment in Lanzendorf for handicapped people

Client: Architekturwerkstatt Graz
Performance: supporting structure design, geotechn. report

Leistungszeitraum: 2008/02 - 2012

Inpark Eggenberg, seven-storey new construction of a hotel

Client: EG – CENTER Errichtung und Verwaltung G.m.b.H.
Performance: complete supporting structure design

Leistungszeitraum: 2008 - 2011

Residential establishment in Schwechat for handicapped people

Client: Architekturwerkstatt Graz
Performance: supporting structure design

Leistungszeitraum: 2008 - 2009

Avalanche protection tunnel Mitholz

Client: Technical University Graz
Performance: drafting of an epert’s report on failure reasons

Leistungszeitraum: 2008/11 - 2009/03

Clocktower Graz, redevelopment of the timber construction

Client: City Graz – property management
Performance: structural evaluation, redevelopment concept

Leistungszeitraum: 2008 - 2009

Real estate evaluation, Eggendorf – M Hofer KG

Client: Michael Hofer KG
Performance: Evaluation of the physical structure and the equipment of the real estate

Leistungszeitraum: 2008

Silo-plant STAMAG in Graz , new constr. of a grain silo plant

Client: BM Ing. Ewald Haider GmbH
Performance: supporting structure design and design of explosion prevention

Leistungszeitraum: 2008 - 2009

Schafler – flour mill, new constr. of a granary

Client: Schafler – Mühle Ges.m.b.H.
Performance: structural analysis and explosion prevention

Leistungszeitraum: 2008 - 2009

Carpenter’s workshop Kletzenbauer, extension-production hall

Client: Tischlerei Kletzenbauer GmbH & Co KG
Performance: general design

Leistungszeitraum: 2008 - 2009

A2 Südautobahn – feeder Mooskirchen – general refurbishment

Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, structural analysis, etc.

Leistungszeitraum: 2008/03

A2 South autobahn – feeder Mooskirchen – Bridgeobjekt ZM8

Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, detailed design

Leistungszeitraum: 2008/01 - 2008/09

Fire prevention design – Raiffaisenlandesbank

Client: Immobilienerwerbs- und Vermietungs-Gesellschaft mbH
Performance: supervision of the fire prevention concept, design of a fire prevention concept, etc.

Leistungszeitraum: 2008 - 2014

Murien – basement garage- Serfaus

Client: Gemeindeamt Serfaus
Performance: structural analysis of the new construction, execution design

Leistungszeitraum: 2007/12 - 2008

Elevated tank construction Ragnitz

Client: Dipl.Ing. Franz Riesel
Performance: construction design, structural analyses

Leistungszeitraum: 2007

L40 general refurbishment, A10 Tauernautobahn

Client: ASFINAG Autobahn Service GmbH Süd
Performance: check-up of the statical design of the bracing
construction

Leistungszeitraum: 2007/03 - 2011/06

Wildbrücke, new construction of a road bridge

Client: Stadtgemeinde Völkermarkt
Performance: general design and detailed design in cooperation with the office Zimmermann

Leistungszeitraum: 2007/02 - 2010

LSW Unterwald TA D Ratsch, noise barrier

Client: ASFINAG Autobahn Service GmbH Süd
Performance: general design and detailed design

Leistungszeitraum: 2007/06 - 2008/09

General restoration Rothenthurmbridge

Client: Amt der Steiermärkischen Landesregierung
Performance: general design, tender design, structural analysis, detailed design, etc.

Leistungszeitraum: 2007/03 - 2008/01

A2 Südautobahn-Packabschnitt object P14 acute- reconstruction

Client: ASFINAG Autobahn Service GmbH Süd
Performance: check of the existent construction, suggestion of a restoration

Leistungszeitraum: 2007/01 - 2008/03

A2 Südautobahn- restoration P6 general reconditioning

Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, structural analysis

Leistungszeitraum: 2006/09 - 2007/07

Caritas – school centre, New construction in Graz

Client: more architecture Goltnik ZT – KEG
Performance: fire prevention design

Leistungszeitraum: 2006 - 2008

Hotel Stavanger in Norway, three-storey hotel

Client: Stavanger Touristforening
Peformance: complete supporting structure design

Leistungszeitraum: 2006 - 2007

Timber construction in the form of a soccer ball

Client: Haas Fertigbau Holzbauwerk GmbH & Co KG
Performance: constructional draft and structural analysis

Leistungszeitraum: 2006

P32V Scharasbach-bridge A2 Packabschnitt

Client: Amt d. Steiermärkischen Landesregierung
Performance: statical calculation-consistency check of the structural analysis

Leistungszeitraum: 2005/01 - 2006/07

Retirement home and center for mobile services

Client: Architekturwerkstätte Graz-Architekt Wolf
Performance: construction design, structural analysis

Leistungszeitraum: 2005/12 - 2007/04

Tehran Sewarage, 6 digestion tanks

Client: VA Tech WABAG GmbH
Performance: structural analysis and constuctive design

Leistungszeitraum: 2005/09 - 2007/06

ABM – Bruck a.d.Mur, modification and extension

Client: ASFINAG Service GmbH Süd
Performance: complete supporting structure design

Leistungszeitraum: 2005 - 2008

Housing estate Andritz, New constr. with 5 seperated blocks

Client: Schauersberg Immobilien
Performance: complete supporting structure design

Leistungszeitraum: 2005 - 2007

Office building ASFINAG, extension and addition of stories

Client: ASFINAG Service GmbH Süd
Performance: gesamte Tragwerksplanung

Leistungszeitraum: 2005 - 2006

Gym hall WIKU in Graz

Client: Bundesimmobiliengesellschaft m.b.H.
Performance: structural analysis, execution design

Leistungszeitraum: 2005/03 - 2006/11

G21 – Talübergang, general bridge refurbishment

Client: Amt der Steiermärkischen Landesregierung
Performance: general project and detailed project

Leistungszeitraum: 2004/10 - 2008/07

Graz-Messehalle 11, demounting, reconstruction and bracing

Client: MCG Graz e.gen.
Performance: complete design (incl. supporting structure)

Leistungszeitraum: 2004/12 - 2008/04

Cable bridge in Halbenrain, Pedestrian and bikeway bridge

Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design

Leistungszeitraum: 2004/09 - 2005/12

Pedestrian bridge Ulmgasse

Client: ÖBB-Infrastruktur Bau AG
Performance: general design, tender design, structural analysis, etc.

Leistungszeitraum: 2003/07 - 2004/07

Adaptation and Service Work – Pumping Station Rudersdorf

Client: Stadt Graz – Holding Graz
Performance: documentation and static control of the building, safety and health protection plan, etc.

Leistungszeitraum: 2003 - 2008

Exhibition hall 1 in Graz, hall constr with basement garage

Client: MCG Graz e.gen.
Performance: complete supporting structure design

Leistungszeitraum: 2003 - 2008

Constructional engineering center Graz-Inffeldgasse

Client: Technical University Graz
Performance: complete supporting structure design

Leistungszeitraum: 2003 - 2007

Observation tower St. Peter-Ottersbach, new constr.

Client: Marktgemeinde St.Peter/ Ottersbach
Performance: complete design (incl. supporting structure)

Leistungszeitraum: 2003/05 - 2004/03

Hofermühle-compound feed production plant, new construction

Client: Company M. Hofer KG.Mischfutterwerk
Performance: general design

Leistungszeitraum: 2003 - 2004

P06V Zirknitzgrabenbrücke, Autobahn-arch-bridge

Client: Amt der Steiermärkischen Landesregierung
Performanse: Revision of the general project and detailed design

Leistungszeitraum: 2002/08 - 2006/01

Exhibition hall in Freistadt, cantilever timber- cupola constr.

Client: WIEHAG Gesellschaft mbH
Performance: constructional design and structural analysis

Leistungszeitraum: 2002

Towing rope bridge Lucia, new construction

Client: Dipl. Ing. Karisch
Performance: Evaluation of the supporting structure design

Leistungszeitraum: 2002/12 - 2003/04

Restoration ice rink in Salzburg

Client: Graf Holztechnik GmbH
Performance: structural check and inspection report

Leistungszeitraum: 2002/02 - 2002/06

Hotel Urthaler in South Tyrol, timber plate-/slab-construction

Client: family Urthaler/ Seiseralm Italien
Performance: complete supporting structure design

Leistungszeitraum: 2001/07 - 2002/04

Pilgrimage church Frauenberg, rehabilitation of the roof constr.

Client: Construction department of the monastery Admont
Performance: complete supporting structure design

Leistungszeitraum: 2001

Ice rink in Linz, redevelopment concept

Client: SBL-Stadtbetriebe Linz GesmbH Bäder
Performance: complete design

Leistungszeitraum: 2001

P40V Packabschnitt Niessenbachbrücke, new constr.archbridge

Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design

Leistungszeitraum: 2001/01 - 2003/02

School Karl Morre, reinforced concrete- and massive timber constr.

Client: Hypo Steiermark
Performance: complete supporting structure design

Leistungszeitraum: 2000/06 - 2002/09

Ennsbridge Liezen

Client: Amt d. Stmk. Landesregierung
Performance: general design, tender design, structural analysis, etc.

Leistungszeitraum: 1999/04 - 1999/10

Innovation centre W.E.I.Z., three-storey passive house

Client: Weizer Energie- Innovationszentrum
Performance: complete supporting structure design

Leistungszeitraum: 1998/04 - 1999/06

Ski-road-bridge Katschberg, timber bridge construction

Client: Dipl. Ing. Fritz Kermer
Performance: structural analysis and execution design

Leistungszeitraum: 1998

Wewalka, new construction of a production plant

Client: Wewalka GesmbH Nfg. KG
Performance: general design

Leistungszeitraum: 1997/06 - 1999

Massivholz production hall in Kalwang, new construction

Client: Massivholz GesmbH in Kalwang (Stmk)
Performance: general design

Leistungszeitraum: 1997

Digestion tank of a waste water treatment plant in Graz

Client: Bauunternehmung Granit Gesellschaft m.b.H.
Performance: construction design, structural analysis, execution design

Leistungszeitraum: 1996

Wastewater treatment plant Graz-Gössendorf, digestion tank

Client: Bauunternehmung Granit
Performance: structural analysis and execution design

Leistungszeitraum: 1996

Hospital of the “Deutscher Orden” Friesach

Client: Deutscher Orden Friesach
Performance: construction design, execution design

Leistungszeitraum: 1994/06 - 1997/02