The existing arched bridge from 1905 passes under Ibererstraße beneath the southern railway line. The supporting structure has reached the end of its service life and the road cross-section is also to be adapted to the state of the art. The vaulted bridge will therefore be replaced by an integral reinforced concrete structure. The entire structural renewal will be carried out without interrupting traffic.
Client: ÖBB-Infrastruktur AG
Period of performance: 2020 – 2023
Dimensions: Clear wide: 11,0m
Width: 26.5m
Performance: Preliminary design, submission planning, tendering, detailed project
