A09 INTU Tunnel Rottenmann

Hot dimensioning of the existing Rottenmann tunnel.

Client: ASFiNAG Bau Management GmbH

Calculations were carried out with and without consideration of concrete spalling, as well as taking into account structural fire protection.

Period of Performance: 2021

Performance: Hot dimensioning