Client: ASFiNAG Bau Management Gmbh
In the course of regular bridge inspections, bearing misalignments were recognised on some bridges on the S06 and S35. The bearing positions had to be checked and the expected displacements calculated. Based on this, instructions for action and measures were to be developed.
Period of performance: 2021 – 2026
Performance: Special inspection of bridge bearings in accordance with RVS 13.03.11
