Client: Office of the Styrian Provincial Government
The former B065 bridge over the Raab had reached the end of its planned service life. The new bridge was built to improve the alignment of the road on the one hand and the flood discharge on the other. The new construction is a single-span tied-arch bridge in steel-concrete composite construction.
Period of performance: 2018 – 2020
Dimensions:
Span: 29.20m
Width: 14.50m
Arch span: 6.50m
Performance: Preliminary study, water and road law submission, tender planning, detailed project
