Repair concept with static recalculation
Client: ASFiNAG Bau Management GmbH
On the A09 motorway, in the AST Spielfeld area and north and south of the Plabutsch tunnel, as well as on the A02 motorway in the Pack section, several bridges are due for repair. Repair concepts, in some cases with static recalculation, were drawn up to serve as the basis for tender planning.
Period of performance: 2022 – 2023
Performance: Static recalculation, creation of repair concepts based on structural tests, material analyses and recalculation.
