Client: GRDR Architektur ZT GmbH
The aim of the project is to build a bus depot with the necessary infrastructure for a total of 91 buses with alternative drive systems (electric and H2). The project is to be realised in two phases, with the bus depot being operated by buses with conventional drive systems until final completion and beyond. As things stand at present, 4 buildings will be erected: Carport, workshop building (FFM), administration, public H2 filling station, as well as an underground car park for an expected 60 parking spaces.
Period of performance: 2023 – ongoing
Dimensions: 150m x 100m x 12m (L/ W/ H)
Performance:
Preliminary design, construction design, submission planning, implementation planning, participation in the tendering process, participation in the awarding of contracts, support during construction, participation in local construction supervision