Client: Office of the Styrian Provincial Government
The existing Sulmbrücke Aflenz bridge is to be rebuilt due to its poor state of repair. In the course of the new bridge construction, the line of the L621 will be improved, which is why the new bridge will be located upstream of the existing bridge. To improve the flood discharge, the flow cross-section will be enlarged compared to the existing bridge. For reasons of durability and maintenance, the new bridge will be designed as an integral supporting structure.
Period of performance: 2024 – 2025
Dimensions:
Span: 22.40m + 28.70m + 22.40m = 73.50m
Width: 9.75m
Performance: Preliminary design, submission planning, tendering, detailed design
