Client: ASFiNAG Bau Management GmbH
The existing St. Andrä underground route on the A10 Tauern motorway is to be demolished and rebuilt. It is essentially a twin-tube tunnel in cut-and-cover construction.
Period of performance: 2024-2025
Dimensions:
Total length: 470m
Spans: 2x10m
Performance:
Static-constructive inspection
