A10 underground road inspection

Client: ASFiNAG Bau Management GmbH

The existing St. Andrä underground route on the A10 Tauern motorway is to be demolished and rebuilt. It is essentially a twin-tube tunnel in cut-and-cover construction.

Period of performance: 2024-2025

Dimensions:
Total length: 470m
Spans: 2x10m

Performance:
Static-constructive inspection