Extension and remodelling of Villach town hall

Client:
Architekten Titus Pernthaler ZT GmbH

The extension and conversion of the Villach ice rink is divided into two sub-projects (TP01 & TP02).
TP01 involves the conversion of the existing hall. In TP02, the extension of an approx. 60m long and 22m wide 3-storey spandrel structure is being built directly adjacent to the south façade of the existing building. Directly adjacent to the gusset structure, a new training and ice rink measuring approx. 2250m² is being built.

Period of performance:
Construction phase I: 2023-2024
Construction phase II: 2025-2026

Dimensions:
Construction phase I:
85m x 60m x 16m
Construction phase II:
Spandrel structure: 60m x 22m x 16m
Ice rink: 65m x 35m x 12m

Performance:
Structural design steel, timber and solid construction (brick & concrete construction),
Implementation planning, fire protection planning