Client:
ASFINAG Bau Management GmbH
The project involves the renovation of the S35 Brucker Schnellstraße, RFB Bruck in the Badl – Peggau/Deutschfeistritz section.
The following bridges will be repaired as part of the project:
-P1 Murbrücke Badl – km30.427
-P2 ÖBB underpass Badl – km30.933
-P3 Mur bridge Kugelstein – km31.280
-P5 Underpass Peggau – km32.719
-P6 High bridge Peggau – km33.512
-P7 Peggau Mur bridge – km34.327
The project also includes the repair of the SW-29.250 support structure.
This is to be fitted with a facing shell and a state-of-the-art vehicle restraint system.
Period of performance:
2025 to 2027
Dimensions:
-P1 Badl Mur Bridge
width 13.20 m, length 141.25 m
-P2 ÖBB Badl underpass
width 13.20 m, length 175.00 m
-P3 Mur Bridge Kugelstein
width 13.20 m, length 291.91 m
-P5 Peggau underpass
width 14.75 m, length 12.70 m
-P6 Peggau high bridge
width 13.20 m, length 527.96 m
-P7 Peggau Mur Bridge
width 13.20 m, length 271.50 m
Performance:
Tender planning, detailed design
