A09 ASt Trieben

Client:
ASFINAG Bau Management GmbH

Two bridges on the A09 motorway in the Trieben area are due for repair. Repair concepts with static recalculation of the cantilever slab were drawn up to serve as a basis for the tender planning.

Period of performance:
2025

Dimensions:
Span: 10.0 m + 18.0 m + 10.0 m = 38.0 m
Width: 9.5 m

Performance:
Static recalculation
Creation of repair concepts based on structural inspections, material tests and recalculation.