In order to meet the high demands of “organic customers”, the new organic milling line must be installed 100% separately from the conventional existing lines, from the grain delivery to the finished product (on pallets or loaded in batches).
A combined organic mill for grinding wheat, rye and spelt will be built. A new flour silo in reinforced concrete sliding construction will be built. Grain reception and bulk loading will be integrated into the existing plant. Furthermore, a separate bagging plant will be built.
Period of performance: 09/2022 – ongoing
Start of construction planned: 1st quarter 2024
Performance:
Overall planning and coordination
Static-constructive processing
Award procedure
ÖBA construction
BauKG
Fire protection