In order to meet the high demands of “organic customers”, the new organic milling line must be installed 100% separately from the conventional existing lines, from the grain delivery to the finished product (on pallets or loaded in batches).
A combined organic mill for grinding wheat, rye and spelt will be built. A new flour silo in reinforced concrete sliding construction will be built. Grain reception and bulk loading will be integrated into the existing plant. Furthermore, a separate bagging plant will be built.
Period of performance: 09/2022 – ongoing
Start of construction planned: 1st quarter 2024
Performance:
Overall planning and coordination
Static-constructive processing
Award procedure
ÖBA construction
BauKG
Fire protection
Client: Anton Kittel Mühle Plaika GmbH
New construction of a BIO silo plant in slipform construction
with 35 cells on a floor space of 518m² and a storage capacity of
storage capacity of 11.1 tonnes with the following additional components:
– Receiving and loading
– dryer
– Intermediate building
Period of performance: 06/21 – ongoing
Start of construction: CW 10/23
Dimensions: 37.00m x 14.00m x 55.00m
Performance: Overall planning and coordination
Structural design processing
Master builder tender incl. sub-trades
Participation in the awarding of contracts
ÖBA construction
BauKG
Fire protection
New construction of a organic compound feed
Client: Gsellmann Immo GmbH
New construction of a organic compound feed in steel construction on a floor space of 1.600m² and a storage capacity of 7.200 tons with the following objects:
• Truck reception raw material (pre-cleaned) with rear tipper
• cleaning tower – storage cells raw material (silo cells)
• staircase
• machine wing (production) on different levels, incl. social room
• truck loading (bulk loading) with weighbridge
• truck delivery for silo trucks (blowing lines)
• Storage hall and filling of bagged goods and big bags
• Transformer building
In addition, a tent hall with an area of 385m² was erected as well as 9 truck parking spaces.
Period of performance: 11/2020 – ongoing
06/2021 until 11/2022 (construction)
Dimensions: 45.00m x 42.00m x 38.00m
Performance: Overall planning and coordination; Structural engineering; Construction tendering incl. sub-trades; Participation in awarding ÖBA BauKG Fire protection.
Anaerobic tank (digester)
Client: Austria Juice GmbH
The planned new cylindrical anaerobic tank (digester) will have an internal diameter of 17.20m and a total height of approx. 21.00m.
The tank volume is 4,200.00m³. The tank will be built as a solid construction with pre-stressing, an enveloping metal façade incl. rock wool insulation as well as a green roof including a stair tower.
Period of performance: 07/22 – ongoing
Completion July 2024 planned
Dimensions: diameter=18,00m / height=21,00m
Performance: Static constructive processing,
tendering of master builder incl. sub-trades,
participation in the awarding of contracts, ÖBA, BauKG, fire protection
Extension of the bio-storage silo
Client: Vitakorn Organic Feed Ges.m.b.H.
Extension of the bio-storage silo in solid construction with 28 cells on a floor area of 650m² and a storage capacity of 10.1 tons with the following additional components:
– Installation of a steam boiler house in the existing building
– Extension by two rear and side tipper castings
– New construction of weighbridge
as well as new construction of a bio-centre with office space and staff accommodation”.
Period of performance: 2020 – ongoing
Dimensions:
Bio storage silo = 30.20m x 20.20m x 35.20m
Bio Centre = 20.00m x 13.15m x 12.30m
Performance: Overall planning and coordination
Structural engineering
Construction tendering incl. sub-trades
Participation in the awarding of contracts
ÖBA, BauKG, Fire protection
New construction silo facility Hungary – cement silo
Client: Gleitbau Salzburg GmbH
Period of performance: 2021-2022
Dimensions: 22m x 22m x 32m (L/W/H)
Service: Structural planning of steel construction, concrete construction, execution planning
Extension of bulk loading including acceptance gutter and conversion of existing buildings
Client: Bioprodukte Pinczker GmbH
Dimensions: 30.75m x 6.45m x 16.20m (L/W/H)
Performance: general planning, structural planning, fire protection planning, implementation planning, site supervision, BauKG
Demolition and rebuilding of the semolina loading facility
Client: GoodMills Austria GmbH Loading
Period of performance: 2017-2018
capacity: 936 t
Dimensions: 19.40mx 9.80mx 32.30m (L/ W/H)
Services: general planning, structural planning, fire protection planning, implementation planning, site supervision, BauKG
Client: GoodMills Cesko
Period of performance: 2019-2020
Storage capacity: approx. 1350 t
Dimensions of the silo building: 19.30mx 13.25mx 26.95m (L/ W/ H)
Service: Concept planning, costing, structural planning, static-constructive processing
Client: Holding Graz / Municipal Services GmbH
Period of performance: 2019
Usable area: 3,570.00m²
Dimensions: 91.00mx 30.00mx 7.50m (L/ W/ H)
Information: holdings from 1912
Services: Inventory, general static calculation (steel and timber construction), elaboration of the renovation concept in coordination with the BDA, fire protection planning, rough cost estimate,