Extension and conversion of laundry
of the KAGes Textile Service
Client:
KS Baumanagement GmbH
Owner:
Steiermärkische Krankenanstaltengesellschaft m.b.H.
The extension and remodelling of the laundry of the KAGes Textilservice consists of two separate structures. The single-storey extension is made of reinforced concrete. A single-storey extension option is being considered for the buildings. Various conversions will be carried out in the existing building.
Period of Performance:
2024 to 2025
Dimensions:
BT1: 10m x 5m x 5m (L / W / H)
BT2: 10m x 10m x 5m (L / W / H)
Performance:
Structural design solid construction (brick & concrete construction)
Implementation planning

School of Ceramics Stoob
Client: Graf-Holztechnik GmbH
The workshop extension of the ceramics college is being realised with a
monopitch roof timber construction.
Period of performance: 10/2024 to 12/2024
Dimensions:
19.6m x 96.0m and
19.6m x 75.4m
Performance:
Structural design timber construction

Clinic extension Haus Joseph
Client: Architekturwerkstatt Graz
House Joseph, operated by the Maria Theresien Klinik (Radkersburger Hof), is to be extended by a 4-storey annex. The lower three floors are to be used as room wings, the top floor as an administrative wing.
Period of performance: 2023 – 2024
Dimensions: 40m x 20m x 15m (L/W/H)
Performance: Structural planning for steel and reinforced concrete construction, tender planning and execution planning

Residential building Stainz
Construction phase I
Client: Gemeinnützige Grazer Wohnungsgenossenschaft registered co-operative with limited liability
The 11,000m² housing estate consists of 7 properties, 4 of which are being built as semi-detached houses. The project is divided into two construction phases, whereby construction phase I has already been completed.
Period of performance: 2018 – 2021 (construction phase I)
Dimensions: 150m x 100m x 15m (L/ W/ H/)
Performance: Structural design of steel, timber and solid construction (brick & concrete construction), tender planning, execution planning

S37 Overpass Scheifling
Client: ASFiNAG Bau Management GmbH
Investigation of variants and detailed planning of an overpass bridge in timber-concrete composite construction over the S37 Klagenfurt motorway.
Period of performance: 2023 – 2024
Dimensions:
Support width: 34,00m
Wide: 8,00m
Performance: Feasibility study and detailed planning

Bridge objects A09 Pyhrn motorway and A02 South motorway-Styria South
Repair concept with static recalculation
Client: ASFiNAG Bau Management GmbH
On the A09 motorway, in the AST Spielfeld area and north and south of the Plabutsch tunnel, as well as on the A02 motorway in the Pack section, several bridges are due for repair. Repair concepts, in some cases with static recalculation, were drawn up to serve as the basis for tender planning.
Period of performance: 2022 – 2023
Performance: Static recalculation, creation of repair concepts based on structural tests, material analyses and recalculation.

New construction of raab bridge
Client: Office of the Styrian Provincial Government
The former B065 bridge over the Raab had reached the end of its planned service life. The new bridge was built to improve the alignment of the road on the one hand and the flood discharge on the other. The new construction is a single-span tied-arch bridge in steel-concrete composite construction.
Period of performance: 2018 – 2020
Dimensions:
Span: 29.20m
Width: 14.50m
Arch span: 6.50m
Performance: Preliminary study, water and road law submission, tender planning, detailed project

Testing and inspection of retaining structures
Client: ASFiNAG Bau Management GmbH
Testing and inspection of numerous unanchored support structures on the A09, S06, S35 and S36 motorways in accordance with RVS 13.06.61
Period of performance: 2021
Performance: Structural tests and inspections in accordance with RVS 13.06.61

A09 INTU Tunnel Rottenmann
Hot dimensioning of the existing Rottenmann tunnel.
Client: ASFiNAG Bau Management GmbH
Calculations were carried out with and without consideration of concrete spalling, as well as taking into account structural fire protection.
Period of Performance: 2021
Performance: Hot dimensioning

Structural analysis Gramatneusiedl
The remodelling of Gramatneusiedl station includes a reception building, a passenger footbridge, station roofs and a technical building.
Client: ÖBB-Infrastruktur AG
Period of performance: 2022 – 2023
Dimensions: Passenger footbridge: 2m x 17m
Performance: Structural design review of the tender and detail project
Source of the illustration: © ÖBB / ZKPT / 3-D Schmiede

Renewal of arched bridges
The existing arched bridge from 1905 passes under Ibererstraße beneath the southern railway line. The supporting structure has reached the end of its service life and the road cross-section is also to be adapted to the state of the art. The vaulted bridge will therefore be replaced by an integral reinforced concrete structure. The entire structural renewal will be carried out without interrupting traffic.
Client: ÖBB-Infrastruktur AG
Period of performance: 2020 – 2023
Dimensions: Clear wide: 11,0m
Width: 26.5m
Performance: Preliminary design, submission planning, tendering, detailed project

Surgery BE 4a (LKH 2020 B)
Test statics surgery BE 4a
Client: Steiermärkische Krankenanstalentgesellschaft m.b.H.
In the old building of the surgery complex, in construction phase 4a
due to functional improvements, some rooms in the east wing were
changed in their utilisation. The structural measures ranged from
from earthquake frames made of steel and reinforced concrete, masonry
grouting, ceiling reinforcements and a load test to determine the load-bearing capacity
to determine the load-bearing capacity of a slab beam ceiling.
Period of Performance: 2019 – 2022
Service: Structural testing, consultant activity

Scout house
New building of the scout house
Client: scout group graz 10
A new clubhouse is to be built for the scout group
Period of performance: 2023 – 2024
Dimensions: 25m x 8m x 9m (L/W/H)
Performance: Submission planning, detailed planning, fire protection planning, local construction supervision, work of the construction site coordinator

New construction of anaerobic reactor
Anaerobic tank (digester)
Client: Austria Juice GmbH
The planned new cylindrical anaerobic tank (digester) will have an internal diameter of 17.20m and a total height of approx. 21.00m.
The tank volume is 4,200.00m³. The tank will be built as a solid construction with pre-stressing, an enveloping metal façade incl. rock wool insulation as well as a green roof including a stair tower.
Period of performance: 07/22 – ongoing
Completion July 2024 planned
Dimensions: diameter=18,00m / height=21,00m
Performance: Static constructive processing,
tendering of master builder incl. sub-trades,
participation in the awarding of contracts, ÖBA, BauKG, fire protection

Hochsteiner bridges I + II
B64 Restoration
Client: Office of the Provincial Government of Styria, Department 16
The Hochsteiner bridges I + II, on the B64 – Rechberg Straße, are to be subjected to interim maintenance. The pavement, the waterproofing and the drainage will be renewed. The existing edge beams including railings are to be retained.
In order to improve durability and simplify future maintenance, the road future maintenance, roadway transition structures will be dispensed with, the objects will be converted into semi-integral supporting structures.
Performance: Tender design, detailed design

Favoritenstreet 183-185
Extension and reconstruction favoritenstreet 183-185
Client: architectural office Leopold ZT GmbH
Period of performance: 2021 – 2023
Dimensions: 70m x 40m x 20m (L/W/H)
Performance: Structural planning of steel construction, concrete construction, timber construction, plan of execution

LKH Graz south-west
Overall refurbishment C5/C6 LKH south-west
Client: Steiermärkische Krankenanstaltengesellschaft.m.b.H.
Service Technisches Dienstleistungszentrum
Period of performance: 2023 – 2024
Dimensions: 50m x 10m x 10m (L/W/H)
Performance: Structural planning of steel construction, concrete construction, timber construction, plan of execution

Silo Hunhary
New construction silo facility Hungary – cement silo
Client: Gleitbau Salzburg GmbH
Period of performance: 2021-2022
Dimensions: 22m x 22m x 32m (L/W/H)
Service: Structural planning of steel construction, concrete construction, execution planning

Addition BG/BRG Weiz
Addition to the BG/BRG Weiz
Client: Architectural office Goltnik ZT GmbH
Period of performance: 2021-2022
Dimensions: 50m x 15m x 10m (L/W/H)
Performance: Structural planning of steel construction, concrete construction, execution planning
Leistungszeitraum: (Deutsch) 2021-2022

Housing construction Ruthardweg
New construction of a 4-storey residential building including an underground car park
Client: KS Baumanagement Ges.m.b.H.
Period of performance: 2020-2022
Dimensions: 40m x 40m x 13m (L/W/H)
Performance: Structural planning, concrete construction, implementation planning
Leistungszeitraum: 2020-2022

Thermal spa in the Zillertal
Extension and renovation of the Fügen thermal baths in the Zillertal for the Freizeitzentrum Zillertal GmbH
Client: FIPE ARCHITETURE ZT OG
Renewal of the entrance area as a stilt construction in steel frame construction with cross-laminated timber panels with a relaxation room on the 1st floor (about 15x40m). Extension of a three-storey steel-wood building with children’s area and changing rooms on the 1st floor, relaxation room and covered terrace on the 2nd floor and roof terrace (about 17.5x40m). Extension of a reinforced concrete building with an outdoor pool with 125m², a plunge pool and a sauna area (approx 20x40m).

Postquadrat – Housing construction Alte Poststraße
New construction of two wooden residential buildings with partial basements with underground parking for PREMIUM Immobilien GmbH
Client: Praschl-Goodarzi Architects ZT-GmbH
Period of Performance: 2019-2021
Dimensions: 60m x 40m x 13m (L / W / H)
Service: Structural planning, concrete construction, timber construction, implementation planning, fire protectic
Pictures: Copyright PREMIUM Immobilien

SeneCura Dobl
Construction of a new care home for the SeneCura Kliniken und Heimebetriebsgesellschaft mbH
Client: M&R GU GmbH
Period of Performance: 2020
Dimensions: 100m x 75m x 11m (L / W / H)
Service: Structural planning, concrete construction, implementation planning
Pictures: Copyright architectural office Harich

Student residence Innsbruck
Reconstruction, extension and extension of a 17.5m high existing building in Maximilianstrasse in Innsbruck
Client: Wallner & Schemitsch civil engineers
Period of performance: 2019-2021
Dimensions: 30m x 36m x 17m (L/W/H)
Services: structural engineering steel construction, concrete construction, timber construction, implementation planning, fire protection

Historic glass house Graz
Refurbishment of the historic steel and glass construction of the palm house in the Graz Botanical Garden
Client: BIG – Bundesimmobiliengesellschaft
Period of performance: 2018-2021
Dimensions: 56m x 8.5m x 11m (L / W / H)
Services: structural engineering steel construction, concrete construction, timber construction, implementation planning, fire protection

New building Silicon Austria Labs (SAL) & DH (DataHouse) TU Graz
Client: Zinterl Architekten ZT GmbH
Constructor: BIG Bundesimmobiliengesellschaft m.b.H.
Period of performance: 2018-2021
Overall dimensions: approx. 180m x 35m
Max. Height: about 20m
Performance: Static constructive preliminary design, structural design
Calculation of quantities, tendering (LVs building master work)
Detailed static calculation of concrete construction
Execution planning concrete construction (formwork and reinforcement)
Reinforcement acceptance

SMART CITY MIDDLE (SCM) Office building AVL
Client: SOD Office Development GmbH
Overall dimensions: approx. 90m x 20m
Max. Height: about 25m
Performance: Detailed static calculation of concrete construction
Execution planning concrete construction (formwork and reinforcement)
Reinforcement acceptance
Leistungszeitraum: 2018-2021

SMART CITY MITTE (SCM) parking garage AVL
Client: AVL List GmbH
Period of performance: 2018-2021
Overall dimensions: approx. 80m x 30m
Max. Height: about 20m
Performance: Detailed static calculation of concrete construction
Execution planning concrete construction (formwork and reinforcement)
Reinforcement acceptance

Pinzcker Vienna
Extension of bulk loading including acceptance gutter and conversion of existing buildings
Client: Bioprodukte Pinczker GmbH
Dimensions: 30.75m x 6.45m x 16.20m (L/W/H)
Performance: general planning, structural planning, fire protection planning, implementation planning, site supervision, BauKG
Leistungszeitraum: 2019-laufend

Farina Mill
Demolition and rebuilding of the semolina loading facility
Client: GoodMills Austria GmbH Loading
Period of performance: 2017-2018
capacity: 936 t
Dimensions: 19.40mx 9.80mx 32.30m (L/ W/H)
Services: general planning, structural planning, fire protection planning, implementation planning, site supervision, BauKG

Flour silo Kyjov (Tschechien)
Client: GoodMills Cesko
Period of performance: 2019-2020
Storage capacity: approx. 1350 t
Dimensions of the silo building: 19.30mx 13.25mx 26.95m (L/ W/ H)
Service: Concept planning, costing, structural planning, static-constructive processing

General refurbishment Johann Puch Museum Graz
Client: Holding Graz / Municipal Services GmbH
Period of performance: 2019
Usable area: 3,570.00m²
Dimensions: 91.00mx 30.00mx 7.50m (L/ W/ H)
Information: holdings from 1912
Services: Inventory, general static calculation (steel and timber construction), elaboration of the renovation concept in coordination with the BDA, fire protection planning, rough cost estimate,

New construction of bio silo plant
Client: Gsellmann Immo GmbH
Period of performance: 2017-2018
Storage capacity: 11.000 T
Dimensions: 41,00m x 12,80m x 57,00m (L/ W/ H)
Performance: general design, structural analysis, fire prevention desgin, execution planning, building supervision, construction coordination for health and safety issues

FBZ Traunkirchen
Client: Graf-Holztechnik GmbH
Period of performance: 2015-2017
Performance: detailed structural analysis of the timber construction

andritz ag
Client: Kulmer Holz-Leimbau GesmbH
Period of performance: 2017
Performance: structural analysis facade

Flood Protection Measure Kainach – Civil Engineering Structures
Client: urban municipality of Voitsberg
Period of performance: 2016-2017
Performance: general design, tender design, detailed design

Quartier 7 Reinighaus Graz
Client: ENW Gemeinnützige Wohnungsgesellschaft m.b.H.
Period of performance: 2016-dato
Performance: structural analysis, fire prevention design

Kammerlokal Carinthia, Klagenfurt
Client: Edgar Hammerl Architektur ZT GmbH
Period of performance: 2017
Performance: structural analysis (general plannung competition 1st prize)

HTL – Villach
Client: IKK Kaufmann-Kriebernegg ZT GmbH
Performance: fire control planning, supervision fire preventions on the field, fire prevention certificate
Leistungszeitraum: 2016 - 2020

Conversion – Andritz AG paper factory Graz
Client: Kamper ZT KG
Period of performance: 2016-2017
Performance: fire prevention design, accompanying fire protection, fire protection certificate

General renovation school center Deutschfeistritz
Competition
Period of performance: 2016/04
Leistungszeitraum: (Deutsch) 2016/04

Favoritenstraße 183-185, Extension and rebuilding
Client: Fa. ATLAS IMPORT EXPORT Ges. m.b.H.
Performance: engineering assessment, structural analysis
Leistungszeitraum: 2015/10 - 2016/03

Cardiac Rehab Bad Ischl
Client: Sozialversicherungsanstalt der gewerblichen Wirtschaft
Performance: accompanying fire protection, fire protection certificate
Leistungszeitraum: 2015 - 2016

ARA Gössendorf Capacity expansion of the post-thickener
Client:Stadt Graz vertreten durch die Holding Graz Services Wasserwirtschaft
Performance: preliminary structural analysis, statically constructive treatment, etc.
Leistungszeitraum: 2015 - 2017

SKA RZ Bad Schallerbach, annex and alteration
Client: BMASK Sektion II – Sozialversicherung
Performance: survey report of the price acceptability
Leistungszeitraum: 2014/05 - 2014/09

Extension of the silo constr. Gsellmann
Client: Gsellmann Mischfuttererzeugung GmbH
Performance: feasibility study, structural and constructive preliminary design, structural analysis
Leistungszeitraum: 2015/03 - 2015/07

New constr. of an apartment building, Graz
Client: Ing. Michelatsch GmbH
Performance: structural analysis, execution design
Leistungszeitraum: 2015 - 2016

S37 Klagenfurter highway – Design of the engineering construction
Client: Asfinag Baumanagement GmbH
Performance: preliminary design, general design, tendering, detailed design
Leistungszeitraum: 2015 - 2017

Check of the structural analysis of the annex of the state hospital in Feldbach
Client: KIG Steiermärkische Krankenanstaltengesellschaft mbH
Performance: check of the structural analysis
Leistungszeitraum: 2014/07 - 2017/07

Pedestrian Bridge Wölzbach
Client: Rauter Fertigteilbau GmbH
Performance: preliminary design, detailed design
Leistungszeitraum: 2014

WIKI gym center Graz
Client: Österreichisches Kinderrettungswerk Landesverband Steiermark
Performance: fire control planning, planning coordination, etc.
Leistungszeitraum: 2014/06 - 2015/06

New construction of a complex of buildings with basement car park, Graz
Client: Millöckergasse 27 – Wohnbau GmbH
Performance: structural analysis, execution design
Leistungszeitraum: 2014/05 - 2015/02

Seniorenzentrum Lassing, new construction
Client: Gem. Wohn- u. Siedlungsgenossenschaft ennstal
Performance: controlling of the execution of the fire prevention measures, fire prevention survey
Leistungszeitraum: 2014 - 2015

Medcampus Graz, new construction
Client: BIG
Performance: controlling of the execution of the fire prevention measures, fire prevention survey
Leistungszeitraum: 2014 - 2017

WIKI gym center Graz, new construction
Client: Österreichisches Kinderrettungswerk
Performance: supporting structure design (concrete constr.)
Leistungszeitraum: 2014 - 2015

Thermal bath Bad Elster, new construction
Client: Graf Holztechnik GmbH
Performance: detailed structural analysis of the timber constr.
Leistungszeitraum: 2014

LISI house on Paolo pontoons, new construction
Client: Hasslacher Holztechnik GmbH
Performance: structural analysis (incl. floating stability analysis)
Leistungszeitraum: 2014/06 - 2014/10

Wheelset axle test bench-Institute of Lightweight design (TU Graz)
Client: Zengerer Planung GmbH
Performance: structural analysis and execution design of the test benches
Leistungszeitraum: 2014/05 - 2014/10

Observation platform Krkonose, new construction
Client: Graf Holztechnik GmbH
Performance: structural preliminary design
Leistungszeitraum: 2014/04

A02 Südautobahn – Bridge constr. A6 to A10 and G22
Client: ASFINAG Service GmbH
Performance: Reconditioning concept and structural reanalysis
Leistungszeitraum: 2014

Bypass-bridges across the Danube
Competition
Leistungszeitraum: 2014/04

Alteration of the train station in Frohnleiten
Client: ÖBB-Infrastruktur Bau AG
Performance: general design, structural check of the existing construction
Leistungszeitraum: 2014

Housing estate Theodor-Körner-Straße 145 u. 145A, Graz
Client: Ing. Michelatsch GmbH
Performance: structural analysis, execution design
Leistungszeitraum: 2014 - 2015

Refurbishment design of the LKH West
Client: Krankenanstalten Immobilienges. mbH
Performance: structural analysis, detailed design
Leistungszeitraum: 2013 - 2014

L704 Gatschberggraben-Bridge, reconditioning
Client: Amt der Steiermärkischen Landesregierung
Performance: Reconditioning concept, structural reanalysis, tender and detailed design
Leistungszeitraum: 2013 - 2014

L615 Saggau-Bridge, general overhaul and widening
Client: Amt der Steiermärkischen Landesregierung
Performance: general design, documents for the water legislation procedure, tender and detailed design
Leistungszeitraum: 2013 - 2014

S35 and S06 – Bridge constr., bridge evaluation
Client: VA TECH WABAG GmbH
Performance: Bridge evaluation incl. structural reanalysis and reconditioning concept
Leistungszeitraum: 2013

Housing estate Eggenberger Allee 33, new construction
Client: Eggenberger Allee 33 – Wohnbau GmbH
Performance: complete supporting structure design
Leistungszeitraum: 2013 - 2014

Housing estate Körösistraße (Graz), new construction
Client: Körösistraße 138 – Wohnbau GmbH & Co KG
Performance: complete supporting structure design
Leistungszeitraum: 2013 - 2014

Tunnel-objects A07, A08 and A09, evaluation of the constructional fire protection and the structural components
Client: ASFINAG Baumanagement GmbH
Performance: incl. package of measures and rough cost estimate
Leistungszeitraum: 2013

Tunnel-objects S01, evaluation of the constructional fire protection and the structural components
Client: ASFINAG
Performance: incl. package of measures and rough cost estimate
Leistungszeitraum: 2013

Grandi Molini, storage building annex
Client: Grandi Molini Handel GmbH
Performance: general design
Leistungszeitraum: 2013 - 2014

thermal bath Kärnten Therme Warmbad-Villach
Client: Kärnten Therme GmbH
Performance: check of the structural analysis
Leistungszeitraum: 2013/03 - 2014/05

City hotel Margaretengürtel
Client: Michaeler & Partner
Performance: structural analyses, formwork and reinforcement design
Leistungszeitraum: 2012/07 - 2012/11

Check static calculation tribune Stadium Klagenfurt
Client: Arbeitsgemeinschaft Euro 2008
Performance: check of the structural analyses, vibration analyses
Leistungszeitraum: 2012 - 2013

McDonalds house for children, new construction
Client: Viereck Architekten ZT – GmbH
Performance: controlling of the execution of the fire prevention measures, fire prevention survey
Leistungszeitraum: 2012 - 2014

General overhaul of the Waltenbach-bridge
Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design
Leistungszeitraum: (Deutsch) 2012/05 - 2013/06

Feldaisttal-bridge in Freistadt Nord
Client: ARGE Ingenieurbau S10 BL 4.2
Peformance: general design and detailed design
Leistungszeitraum: 2012 - 2013

Bridge overhaul – Kainach-bridge G63C
Client: Land Steiermark
Peformance: general design and detailed design
Leistungszeitraum: 2012/03 - 2012/09

Housing estate Rosenkranzgasse 7,9, 11 Graz, new costruction
Client: Ing. Michelatsch GmbH
Performance: complete supporting structure design
Leistungszeitraum: 2012 - 2013

Preservation of evidence “Südgürtel”
Client: Amt der Steiermärkischen Landesregierung
Performance: Preservation of evidence of adjacent constructions
Leistungszeitraum: 2012 - 2016

Grüngasse 25, New construction and refurbishment
Client: Synergie Grüngasse 25
Performance: structural analysis, formwork and reinforcement design
Leistungszeitraum: 2011/07 - 2013/01

Objekt Gaudeamus Velenje School Centre, Slovenia
Client: Oberressl & Kantz ZT-GmbH
Performance: statical calculation
Leistungszeitraum: 2011

Recalculation and strengthening Retirement home Seekirchen
Client: UNIQA Sachversicherung AG
Performance: check of the structural analysis
Leistungszeitraum: 2011 - 2012

S36 Murtal-motorway – Main check of the bridge constr.
Client: ASFINAG Service GmbH Abteilung
Performance: Report and appraisal of the condition of the
construction
Leistungszeitraum: 2011 - 2013/10

Forecourt of the former police station in Bad Radkersburg
Client: Stadtgemeinde Bad Radkersburg
Performance: structural analysis, execution design
Leistungszeitraum: 2011/08 - 2012/08

SKA RZ Bad Aussee, annex and alteration
Client: BMASK Sektion II und Abteilung II/A/3
Performance: survey report of the price acceptability
Leistungszeitraum: 2011

SKA RZ Bad Tatzmannsdorf, partial new construction and modification of a rehabilitation centre
Client: BMASK Sektion II und Abteilung II/A/3
Performance: survey report of the price acceptability
Leistungszeitraum: 2011

Silo-plant Pinczker Albener Hafen, annex of a silo plant
Client: Bioprodukte Pinczker GmbH
Performance: general design
Leistungszeitraum: 2011/04 - 2012/10

Hydroelectric power plant in Kammern
Client: 2G Wasserkraft GmbH
Performance: preliminary structural analysis, detailed structural analysis, etc.
Leistungszeitraum: 2011/03 - 2012/03

General refurbishment of the A02 object P44L „Haswendbrücke“
Client: ASFiNAG Baumanagement GmbH
Performance: general design, tender design, structural analysis
Leistungszeitraum: 2011 - 2013

Weinkellersiedlung Kleinoscheg, new construction of a housing estate
Client: KS – Kern & Sommersguter Bauoptimierung GmbH
Performance: design of a fire prevention concept
Leistungszeitraum: 2010 - 2011

BG/BRG St. Martin Villach, renovation and modification
Client: Bundesimmobiliengesellschaft m.b.H.
Performance: controlling of the execution of the fire prevention measures
Leistungszeitraum: 2010 - 2011/09

Pedagogic academy in Eggenberg, extension and modification
Client: Architekt Goltnik ZT GmbH
Performance: controlling of the execution of the fire prevention measures
Leistungszeitraum: 2010 - 2011

2 railway bridges across the river Drava in Villach
Client: ÖBB Infrastruktur AG
Performance: general design and detailed design
Leistungszeitraum: 2010 - 2012

Digestion tank Shiraz, new construction of 3 cylindrical tanks
Client: VA TECH WABAG GmbH
Performance: construction design, structural analysis and
execution design
Leistungszeitraum: 2010

Bikeway – bridge Bregenz – Hard
Client: Gemeinde Hard – Stadt Bregenz
Performance: complete design project
First prize – competition for the realisation
Leistungszeitraum: 2010

Supply centre LKH Graz, nine-storey building
Client: Krankenanstalten Immobilienges.mbH
Performance: check of the structural analysis
Leistungszeitraum: 2010 - 2014

Housing estate Petersgasse 87 u. Friedensgasse 3, 3a, 3b
Client: Ing. Michelatsch GmbH
Performance: complete supporting structure design
Leistungszeitraum: 2010 - 2011

SKA RZ St.Radegund, new construction of a rehabilitation centre
Client: BMASK Sektion II und Abteilung II/A/3
Performance: Gutachten der Preisangemessenheit
Leistungszeitraum: 2010

Silo-plant STAMAG in Vienna, annex of a barley silo plant
Client: STAMAG-Stadlauer Malzfabrik GesmbH
Performance: supporting structure design
Leistungszeitraum: 2010/07 - 2011/12

Silo construction -Kittel Mühle Plaika, new construction
Client: Anton Kittel Mühle Plaika GmbH
Performance: supporting structure design and design of explosion prevention
Leistungszeitraum: 2010/12 - 2011/06

Bikeway-bridge Bregenz – Hard
Client: Gemeinde Hard – Stadt Bregenz
Performance: complete design performance
First prize – competition for the realisation
Leistungszeitraum: 2010

Supply Centre LKH Graz
Client: Krankenanstalten Immobilienges. mbH
Performance: check of the structural analysis
Leistungszeitraum: 2010 - 2016

Digestion tank Shiraz
Client: VA TECH WABAG GmbH
Performance: construction design, structural analysis, execution design
Leistungszeitraum: 2010

Power plant Almbach, new constr.of a hydroelectr. power plant
Client: Ingenieurbüro Eisner ZT GmbH
Performance: structural preliminary design, detailed structural analysis, formwork and reinforcement design
Leistungszeitraum: 2009/07 - 2010/04

A02 Süd Autobahn, main bridge-evaluation
Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction
Leistungszeitraum: 2009

A09 Pyhrn Autobahn, main bridge-evaluation
Client: ASFINAG Service GmbH Süd
Performance: check-up and appraisal of the bridge construction
Leistungszeitraum: 2009

Villa Hillinger, new construction
Client: Leo Hillinger Privatstiftung
Performance: supporting structure design
Leistungszeitraum: 2009

RCA – hall in Vienna, redevelopment of the roof construction
Client: ÖBB Immobilienmanagement GmbH
Performance: structural evaluation, redevelopment concept
Leistungszeitraum: 2009 - 2010

AST Salzburg Süd – overcrossing A10, triple-webbed T-beam
Client: ASFINAG Baumanagement GmbH
Performance: general design and detailed design
Leistungszeitraum: 2008 - 2011

Residential establishment in Lanzendorf for handicapped people
Client: Architekturwerkstatt Graz
Performance: supporting structure design, geotechn. report
Leistungszeitraum: 2008/02 - 2012

Inpark Eggenberg, seven-storey new construction of a hotel
Client: EG – CENTER Errichtung und Verwaltung G.m.b.H.
Performance: complete supporting structure design
Leistungszeitraum: 2008 - 2011

Residential establishment in Schwechat for handicapped people
Client: Architekturwerkstatt Graz
Performance: supporting structure design
Leistungszeitraum: 2008 - 2009

Avalanche protection tunnel Mitholz
Client: Technical University Graz
Performance: drafting of an epert’s report on failure reasons
Leistungszeitraum: 2008/11 - 2009/03

Clocktower Graz, redevelopment of the timber construction
Client: City Graz – property management
Performance: structural evaluation, redevelopment concept
Leistungszeitraum: 2008 - 2009

Real estate evaluation, Eggendorf – M Hofer KG
Client: Michael Hofer KG
Performance: Evaluation of the physical structure and the equipment of the real estate
Leistungszeitraum: 2008

Silo-plant STAMAG in Graz , new constr. of a grain silo plant
Client: BM Ing. Ewald Haider GmbH
Performance: supporting structure design and design of explosion prevention
Leistungszeitraum: 2008 - 2009

Schafler – flour mill, new constr. of a granary
Client: Schafler – Mühle Ges.m.b.H.
Performance: structural analysis and explosion prevention
Leistungszeitraum: 2008 - 2009

Carpenter’s workshop Kletzenbauer, extension-production hall
Client: Tischlerei Kletzenbauer GmbH & Co KG
Performance: general design
Leistungszeitraum: 2008 - 2009

A2 Südautobahn – feeder Mooskirchen – general refurbishment
Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, structural analysis, etc.
Leistungszeitraum: 2008/03

A2 South autobahn – feeder Mooskirchen – Bridgeobjekt ZM8
Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, detailed design
Leistungszeitraum: 2008/01 - 2008/09

Fire prevention design – Raiffaisenlandesbank
Client: Immobilienerwerbs- und Vermietungs-Gesellschaft mbH
Performance: supervision of the fire prevention concept, design of a fire prevention concept, etc.
Leistungszeitraum: 2008 - 2014

Murien – basement garage- Serfaus
Client: Gemeindeamt Serfaus
Performance: structural analysis of the new construction, execution design
Leistungszeitraum: 2007/12 - 2008

Elevated tank construction Ragnitz
Client: Dipl.Ing. Franz Riesel
Performance: construction design, structural analyses
Leistungszeitraum: 2007

L40 general refurbishment, A10 Tauernautobahn
Client: ASFINAG Autobahn Service GmbH Süd
Performance: check-up of the statical design of the bracing
construction
Leistungszeitraum: 2007/03 - 2011/06

Wildbrücke, new construction of a road bridge
Client: Stadtgemeinde Völkermarkt
Performance: general design and detailed design in cooperation with the office Zimmermann
Leistungszeitraum: 2007/02 - 2010

LSW Unterwald TA D Ratsch, noise barrier
Client: ASFINAG Autobahn Service GmbH Süd
Performance: general design and detailed design
Leistungszeitraum: 2007/06 - 2008/09

General restoration Rothenthurmbridge
Client: Amt der Steiermärkischen Landesregierung
Performance: general design, tender design, structural analysis, detailed design, etc.
Leistungszeitraum: 2007/03 - 2008/01

A2 Südautobahn-Packabschnitt object P14 acute- reconstruction
Client: ASFINAG Autobahn Service GmbH Süd
Performance: check of the existent construction, suggestion of a restoration
Leistungszeitraum: 2007/01 - 2008/03

A2 Südautobahn- restoration P6 general reconditioning
Client: ASFiNAG Service Gesellschaft Süd
Performance: general design, tender design, structural analysis
Leistungszeitraum: 2006/09 - 2007/07

Caritas – school centre, New construction in Graz
Client: more architecture Goltnik ZT – KEG
Performance: fire prevention design
Leistungszeitraum: 2006 - 2008

Hotel Stavanger in Norway, three-storey hotel
Client: Stavanger Touristforening
Peformance: complete supporting structure design
Leistungszeitraum: 2006 - 2007

Timber construction in the form of a soccer ball
Client: Haas Fertigbau Holzbauwerk GmbH & Co KG
Performance: constructional draft and structural analysis
Leistungszeitraum: 2006

P32V Scharasbach-bridge A2 Packabschnitt
Client: Amt d. Steiermärkischen Landesregierung
Performance: statical calculation-consistency check of the structural analysis
Leistungszeitraum: 2005/01 - 2006/07

Retirement home and center for mobile services
Client: Architekturwerkstätte Graz-Architekt Wolf
Performance: construction design, structural analysis
Leistungszeitraum: 2005/12 - 2007/04

Tehran Sewarage, 6 digestion tanks
Client: VA Tech WABAG GmbH
Performance: structural analysis and constuctive design
Leistungszeitraum: 2005/09 - 2007/06

ABM – Bruck a.d.Mur, modification and extension
Client: ASFINAG Service GmbH Süd
Performance: complete supporting structure design
Leistungszeitraum: 2005 - 2008

Housing estate Andritz, New constr. with 5 seperated blocks
Client: Schauersberg Immobilien
Performance: complete supporting structure design
Leistungszeitraum: 2005 - 2007

Office building ASFINAG, extension and addition of stories
Client: ASFINAG Service GmbH Süd
Performance: gesamte Tragwerksplanung
Leistungszeitraum: 2005 - 2006

Gym hall WIKU in Graz
Client: Bundesimmobiliengesellschaft m.b.H.
Performance: structural analysis, execution design
Leistungszeitraum: 2005/03 - 2006/11

G21 – Talübergang, general bridge refurbishment
Client: Amt der Steiermärkischen Landesregierung
Performance: general project and detailed project
Leistungszeitraum: 2004/10 - 2008/07

Graz-Messehalle 11, demounting, reconstruction and bracing
Client: MCG Graz e.gen.
Performance: complete design (incl. supporting structure)
Leistungszeitraum: 2004/12 - 2008/04

Cable bridge in Halbenrain, Pedestrian and bikeway bridge
Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design
Leistungszeitraum: 2004/09 - 2005/12

Pedestrian bridge Ulmgasse
Client: ÖBB-Infrastruktur Bau AG
Performance: general design, tender design, structural analysis, etc.
Leistungszeitraum: 2003/07 - 2004/07

Adaptation and Service Work – Pumping Station Rudersdorf
Client: Stadt Graz – Holding Graz
Performance: documentation and static control of the building, safety and health protection plan, etc.
Leistungszeitraum: 2003 - 2008

Exhibition hall 1 in Graz, hall constr with basement garage
Client: MCG Graz e.gen.
Performance: complete supporting structure design
Leistungszeitraum: 2003 - 2008

Constructional engineering center Graz-Inffeldgasse
Client: Technical University Graz
Performance: complete supporting structure design
Leistungszeitraum: 2003 - 2007

Observation tower St. Peter-Ottersbach, new constr.
Client: Marktgemeinde St.Peter/ Ottersbach
Performance: complete design (incl. supporting structure)
Leistungszeitraum: 2003/05 - 2004/03

Hofermühle-compound feed production plant, new construction
Client: Company M. Hofer KG.Mischfutterwerk
Performance: general design
Leistungszeitraum: 2003 - 2004

P06V Zirknitzgrabenbrücke, Autobahn-arch-bridge
Client: Amt der Steiermärkischen Landesregierung
Performanse: Revision of the general project and detailed design
Leistungszeitraum: 2002/08 - 2006/01

Exhibition hall in Freistadt, cantilever timber- cupola constr.
Client: WIEHAG Gesellschaft mbH
Performance: constructional design and structural analysis
Leistungszeitraum: 2002

Towing rope bridge Lucia, new construction
Client: Dipl. Ing. Karisch
Performance: Evaluation of the supporting structure design
Leistungszeitraum: 2002/12 - 2003/04

Restoration ice rink in Salzburg
Client: Graf Holztechnik GmbH
Performance: structural check and inspection report
Leistungszeitraum: 2002/02 - 2002/06

Hotel Urthaler in South Tyrol, timber plate-/slab-construction
Client: family Urthaler/ Seiseralm Italien
Performance: complete supporting structure design
Leistungszeitraum: 2001/07 - 2002/04

Pilgrimage church Frauenberg, rehabilitation of the roof constr.
Client: Construction department of the monastery Admont
Performance: complete supporting structure design
Leistungszeitraum: 2001

Ice rink in Linz, redevelopment concept
Client: SBL-Stadtbetriebe Linz GesmbH Bäder
Performance: complete design
Leistungszeitraum: 2001

P40V Packabschnitt Niessenbachbrücke, new constr.archbridge
Client: Amt der Steiermärkischen Landesregierung
Performance: general design and detailed design
Leistungszeitraum: 2001/01 - 2003/02

School Karl Morre, reinforced concrete- and massive timber constr.
Client: Hypo Steiermark
Performance: complete supporting structure design
Leistungszeitraum: 2000/06 - 2002/09

Ennsbridge Liezen
Client: Amt d. Stmk. Landesregierung
Performance: general design, tender design, structural analysis, etc.
Leistungszeitraum: 1999/04 - 1999/10

Innovation centre W.E.I.Z., three-storey passive house
Client: Weizer Energie- Innovationszentrum
Performance: complete supporting structure design
Leistungszeitraum: 1998/04 - 1999/06

Ski-road-bridge Katschberg, timber bridge construction
Client: Dipl. Ing. Fritz Kermer
Performance: structural analysis and execution design
Leistungszeitraum: 1998

Wewalka, new construction of a production plant
Client: Wewalka GesmbH Nfg. KG
Performance: general design
Leistungszeitraum: 1997/06 - 1999

Massivholz production hall in Kalwang, new construction
Client: Massivholz GesmbH in Kalwang (Stmk)
Performance: general design
Leistungszeitraum: 1997

Digestion tank of a waste water treatment plant in Graz
Client: Bauunternehmung Granit Gesellschaft m.b.H.
Performance: construction design, structural analysis, execution design
Leistungszeitraum: 1996

Wastewater treatment plant Graz-Gössendorf, digestion tank
Client: Bauunternehmung Granit
Performance: structural analysis and execution design
Leistungszeitraum: 1996

Hospital of the “Deutscher Orden” Friesach
Client: Deutscher Orden Friesach
Performance: construction design, execution design
Leistungszeitraum: 1994/06 - 1997/02